The West Sacramento Area Flood Control Agency (WSAFCA/Agency) was formed in 1994 through a Joint Exercise of Powers Agreement among the 西萨克拉门托市 (City), Reclamation District 900, and Reclamation District 537. WSAFCA is composed of a 3-member Board and supported by City staff. WSAFCA is working toward achieving 200-year level flood protection for the West Sacramento community by 2025.

Due to catastrophic Hurricane Katrina, the United States Corps of Engineers (USACE) upped the standards for levees and WSAFCA responded by implementing the West Sacramento Levee Improvement Program (WSLIP). 在这个项目下, the California Department Water of Resources (DWR) and WSAFCA completed three Early Implementation Projects (EIP): I Street Bridge (2008), CHP Academy (2011) and Rivers Project (2011). During the Southport EIP, the West Sacramento Project was authorized by Congress in the Water Infrastructure Improvements for the Nation Act (2016). The Southport Setback Levee Project became the first component of the federally authorized Project.

对于下一个增量, WSAFCA and DWR led design efforts for the Yolo Bypass East Levee due to insufficient Preconstruction Engineering and Design federal funding. The Agency is currently awaiting construction funding and new start designation.


WSAFCA is working quickly and efficiently to face the challenges of stricter flood control standards imposed by the State. These standards must be met by 2025 and WSAFCA is working together with their project partners to make the required improvements a reality.

Why is WSAFCA improving levees in West Sacramento?

  • The number one priority of the 西萨克拉门托市 is to increase public safety and protect property.
  • To achieve a minimum 200-year level of flood protection as mandated by the State.
  • To ensure continuing federal and State funding assistance for levee repairs and maintenance.

The City and West Sacramento Area Flood Control Agency have created partnerships to leverage local funds with State and federal flood risk reduction funding. The majority of the cost for the levee improvement projects are funded by cost sharing agreements with our partnering agencies.

有什么新鲜事

发布日期
Article
10/22/21 RFP for Sacramento River West North Levee Project Environmental 海洋之神登录入口 Available on ProcureNow
10/08/21 RFP for Sacramento River West North Levee Project Surveying 海洋之神登录入口 Available on ProcureNow
07/08/21 FEMA Introduces Risk Rating 2.0:行动权益
08/21/20  FEMA approved CRS recertification. The current rating is maintained at Class 6.
06/08/20 Southport Levee Project Article published in the Civil Engineering Magazine
03/11/16 WSAFCA Board meetings have moved from the second Thursday to the third Thursday of each month at 9:00 a.m.


Video: Sacramento River Flood Control System


合作伙伴

CVFPBrd900_logo - 4 - 300 x125


海洋之神官方网站 

西萨克拉门托市
Civic Center, Second Floor
西国会大道1110号
West Sacramento, CA 95691 
(916) 617-4645

WSAFCA董事会成员

工作人员

更多的员工

WSAFCA员工

工作人员

更多的员工

For Flood Zoning Inquiries:

格雷格Fabun
防洪 Manager
gregf@2002fg.net